Waters ES Bathroom Upgrades REBID
Sector: Water Supply and Storage • Location: Chicago, Illinois, United States of America
Source: Dodge USA
Remove existing epoxy floors in 6 bathrooms and repair all cracks Prepare and install new epoxy floors in 6 bathrooms according to CPS specifications Epoxy to also roll up wall 4 for base Remove and replace partitions in all 6 bathrooms according to CPS specifications Remove and replace toilets/urinals/sinks and associated fixtures/seats in all 6 bathrooms. This is to be priced out as a per bathro
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Education, Government
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Waters ES Bathroom Upgrades REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove existing epoxy floors in 6 bathrooms and repair all cracks Prepare and install new epoxy floors in 6 bathrooms according to CPS specifications Epoxy to also roll up wall 4 for base Remove and replace partitions in all 6 bathrooms according to CPS specifications Remove and replace toilets/urinals/sinks and associated fixtures/seats in all 6 bathrooms. This is to be priced out as a per bathroom cost. Colors to be chosen by school |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Education, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
