Water/Sewer Project in Mertarvik
Planned · Alaska · Last reported Mar 2025
Source: KYUK
Managed by the Alaska Native Tribal Health Consortium, this project aims to connect the water and sewer system to the new school by August 2026, with homes expected to be connected by 2027 or 2028. The estimated cost of the project is $38 million.
- Status
- Prospective
- Sector
- Education, Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT)
- Location
- Mertarvik, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- KYUK
ConstructChat
Ask ConstructChat about Water/Sewer Project in Mertarvik
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Managed by the Alaska Native Tribal Health Consortium, this project aims to connect the water and sewer system to the new school by August 2026, with homes expected to be connected by 2027 or 2028. The estimated cost of the project is $38 million. |
Original sector | Water/Sewer |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Mertarvik |
Source
Source | KYUK |
URL |
More Details
Record type | Project |
Sector | Education, Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT) |
Article published date | 2025-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
