logo
ProjectUnder Construction

Watertown Solar Project

One of 10,000+ projects Taiyo tracks in Michigan.

Source: Lelezard

Watertown is a 172 MWdc utility-scale solar energy facility located in Sanilac County, Michigan. The project includes a construction-to-term loan, a tax equity bridge loan, and a letter of credit facility. It has a 25-year power purchase agreement with Consumers Energy and is expected to support approximately 150 construction jobs, generate enough clean energy to power 25,126 homes annually, and d

Status
Under Construction
Sector
Power Transmission, Bridge, Solar, Power Generation (CCGT)
Location
Watertown, Michigan, United States of America
Updated
22 Jul 2026
Source
Lelezard

ConstructChat

Ask ConstructChat about Watertown Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Watertown Solar Project” is an infrastructure initiative in the Power Transmission sector, located in Watertown, Michigan, United States. Taiyo aggregates data on it from Lelezard.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Watertown is a 172 MWdc utility-scale solar energy facility located in Sanilac County, Michigan. The project includes a construction-to-term loan, a tax equity bridge loan, and a letter of credit facility. It has a 25-year power purchase agreement with Consumers Energy and is expected to support approximately 150 construction jobs, generate enough clean energy to power 25,126 homes annually, and deliver $16.4 million in local property tax revenue over 20 years.

Original sector

Energy

Location

Country

United States of America (USA)

State

Michigan

City

Watertown

Source

Source

Lelezard

URL

More Details

Record type

Project

Sector

Power Transmission, Bridge, Solar, Power Generation (CCGT)

Article published date

2026-03-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project