WATKINSVILLE PEDESTRIAN SYSTEM IMPROVEMENTS - PHASE II
Sector: Car parking • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project consists of sidewalk improvements, replacement of streetlights that are more aesthetically pleasing, and landscape plantings. The project also includes relocation of a portion of the fence around Rocket Field to allow the construction of new sidewalks and pedestrian connections. A portion of the project on Main Street (SR 15) and the improvements around Rocket Field inlcude minor st
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive, Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about WATKINSVILLE PEDESTRIAN SYSTEM IMPROVEMENTS - PHASE II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of sidewalk improvements, replacement of streetlights that are more aesthetically pleasing, and landscape plantings. The project also includes relocation of a portion of the fence around Rocket Field to allow the construction of new sidewalks and pedestrian connections. A portion of the project on Main Street (SR 15) and the improvements around Rocket Field inlcude minor storm drainage system improvments to accomodate the proposed sidewalks while minimizing property impacts. The total length of the sidewalks is approximately 5620 linear feet. Segment A along Main Street (SR 15) is approximately 1300 linear feet of 5-foot sidewalk. Segment B along School Street and Third Street is approximately 2160 linear feet of sidewalk. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive, Waste Processing and Treatment |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
