WAW1 Data Centre Campus
Sector: Power Generation (CCGT) • Location: Warsaw, Poland
Source: Data Centre Magazine
Switch Datacenters is building a new 90MW data centre campus in the Mory district of Warsaw, Poland. This is the company's first international facility outside the Netherlands, designed to support high-density AI workloads and traditional cloud and compute applications. The campus will use hybrid dry cooling technology for energy efficiency and integrate with local renewable energy sources to main
- Status
- Prospective
- Sector
- Power Generation (CCGT), Data Center, Residential, Commercial
- Location
- Warsaw, Poland
- Updated
- 22 Jul 2026
- Source
- Data Centre Magazine
ConstructChat
Ask ConstructChat about WAW1 Data Centre Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Switch Datacenters is building a new 90MW data centre campus in the Mory district of Warsaw, Poland. This is the company's first international facility outside the Netherlands, designed to support high-density AI workloads and traditional cloud and compute applications. The campus will use hybrid dry cooling technology for energy efficiency and integrate with local renewable energy sources to maintain sustainability standards. The initial phase delivers 90MW of IT power with potential to exceed 100MW in future phases. Construction is scheduled to begin in early 2026, with the site expected to be operational by early 2027. |
Original sector | Data Centres |
Location
Country | Poland |
City | Warsaw |
Source
Source | Data Centre Magazine |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center, Residential, Commercial |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
