Wawa Pumped Storage Project
Sector: Natural Gas • Location: Philippines
Source: International Water Power
The Wawa pumped storage project (600MW) in Rizal Province, Philippines, is in Phase 2 construction with SMEC as Owner’s Engineer. The project includes dams, reservoirs, a powerhouse, and complex tunnel systems, valued at US$2.57 billion. It will provide 6,000MWh of daily storage to supply mid-merit and peak power to the Luzon grid, reducing fossil fuel dependence and improving reliability.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Wawa pumped storage project (600MW) in Rizal Province, Philippines, is in Phase 2 construction with SMEC as Owner’s Engineer. The project includes dams, reservoirs, a powerhouse, and complex tunnel systems, valued at US$2.57 billion. It will provide 6,000MWh of daily storage to supply mid-merit and peak power to the Luzon grid, reducing fossil fuel dependence and improving reliability. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
