The initial contract for a 220MW facility at Wayang Windu was signed in December 1994 by Mandala Magma Nusantara (MMN), a joint venture between the local companies Figears and Oko Satrya Mandala. Both companies were owned by the ex-President Suharto's son Hutomo Mandala Putra, and the US's Magma Power. After California Energy and Magma Power merged, the contract's principal party changed to Asia
- Status
- Prospective
- Sector
- Geothermal, Commercial, Power Generation (CCGT), Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Wayang Windu Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The initial contract for a 220MW facility at Wayang Windu was signed in December 1994 by Mandala Magma Nusantara (MMN), a joint venture between the local companies Figears and Oko Satrya Mandala. Both companies were owned by the ex-President Suharto's son Hutomo Mandala Putra, and the US's Magma Power. After California Energy and Magma Power merged, the contract's principal party changed to Asia Power Ltd, a subsidiary of New Zealand's Brierley Investments. Asia Power eventually took a 95% stake, with the remaining shares being held by the local Bumi Mandala Perkasa. The project was to sell electricity to a state-owned electricity company Parusahaan Listrik Negara (PLN). In 2000, Asia Power completed a 110MW unit but, because PLN was not prepared to pay the initial contracted sale price of $83.9/MWh, Asia Power was unable to repay its loans and the plant was handed over in 2001 to bank creditors, Credit Suisse First Boston and Deutsche Bank. The US's Unocal then took a 50% operating stake in the plant with the other 50% being retained by the banks. In 2004, Wayang Windu, still operating as MMN, was purchased by the local Star Energy in conjunction with Ashmore, a UK-based investment management company. A new contract was negotiated with PLN for the sale of electricity. The deal ran for a 30-year period and provided for up to 400 MW of total capacity at the site, including the operational 110MW unit. The contract was signed in November 2006. Standard Chartered became the financial advisor for the project in 2006 and sole arranger for a 110MW expansion project and subsequently for the refinancing of the existing unit. In February 2007, Standard Chartered Bank started syndicating a US$145million debt facility for the expansion of the Wayang Windu Power Plant. MNN was majority owned by Star Energy and remainder held by funds managed by Ashmore. The project carried government of Indonesia Support Letter. The government, through Ministry of Finance, was to provide PLN’s repayment obligation. The loan facility increased to US$305 million, and Sumitomo Corp was awarded an EPC contract. The US$305 million debt facility reached its financial close on May 3, 2007. In December 2008, Star Energy announced that construction of the second 110 MW unit was nearing completion and was to enter commercial operation by March 2009. Also in December 2008, Star Energy announced a further capacity expansion - units 3 and 4 - with an estimated combined cost of US$450 million. Units 3 and 4 were to expand plant capacity by as much as 280 MW, resulting in total plant capacity of 500 MW. Supply of electricity above the currently contracted 400MW was to be negotiated as part of an extension to the existing energy supply contract with PLN. |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Commercial, Power Generation (CCGT), Government |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Indonesia
- Sarulla Geothermal Power Plant
- Cirebon CoalFired Power Plant Expansion West Java
- Rantau Dedap Geothermal Power Project South Sumatra
- Muara Karang Expansion Project Jakarta Indonesia
- Tanjung Jati B Power Plant Expansion
- PT Medco Sarulla Geothermal Plant
- Karaha Bodas Company
- Sorik Marapi Geothermal Power Plant