Waynesboro City Hall Public Parking Lot Improvements
Sector: Cement • Location: Waynesboro, Georgia, United States of America
Source: Dodge USA
The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: The work to be done shall consist of providing all materials and performing all labor necessary but not limited to rehabilitate the existing Waynesboro City Hall parking lot including installing 6 EV charging stations, risers, 8 concrete dumpster pad, 165 lb/SY of 9.5 mm mix
- Status
- Under Construction
- Sector
- Cement, Government, Automotive, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Road, Car parking
- Location
- Waynesboro, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Waynesboro City Hall Public Parking Lot Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: The work to be done shall consist of providing all materials and performing all labor necessary but not limited to rehabilitate the existing Waynesboro City Hall parking lot including installing 6 EV charging stations, risers, 8 concrete dumpster pad, 165 lb/SY of 9.5 mm mix asphalt, asphalt leveling, curb and gutter, curb stops, and striping. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Waynesboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Automotive, Commercial, Electric Vehicles (EVs), Power Generation (CCGT), Road, Car parking |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
