logo

Wayra Wind Farm

Sector: Commercial • Location: Peru

Source: World Bank Group

Project
Active

The project envisages the construction and operation of a wind farm located in Marcona district, Ica region of Peru. Once completed, the project will feed 132 MW clean energy into the national grid. Enel is sponsoring the project through its subsidiary Enel Green Power Peru. On September 4th, 2017 construction works were initiated.

The new wind facility comprises 42 wind turbines of over 3 MW ea

Status
Prospective
Sector
Commercial, Wind, Power Generation (CCGT), Raw Materials, Government
Location
Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Wayra Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Wayra Wind Farm” is an infrastructure initiative in the Commercial sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project envisages the construction and operation of a wind farm located in Marcona district, Ica region of Peru. Once completed, the project will feed 132 MW clean energy into the national grid. Enel is sponsoring the project through its subsidiary Enel Green Power Peru. On September 4th, 2017 construction works were initiated. The new wind facility comprises 42 wind turbines of over 3 MW each and will be able to generate around 600 GWh per year, equivalent to the annual consumption needs of over 480,000 Peruvian households, while avoiding the emission of nearly 288,000 tonnes of CO2 into the atmosphere each year. Project is being developed on a BOO basis with a 20-year electricity supply contract signed with Peru’s Ministry of Energy and Mines. The Enel Group was awarded in 2016 the right to sign the energy supply contracts for Wayra I following the fourth public renewable energy tender launched by the Peruvian energy regulator OSINERGMIN, based on lowest tariff per unit of energy. Enel is building the farm with own resources. Total investment is estimated at $165 million. In February 2018, the facility started supplying electricity to the national grid. https://www.enelgreenpower.com/media/press/d/2017/09/enel-starts-construction-of-perus-largest-wind-farm https://www.enel.pe/en/media/news/d201802-wayra-i-generates-the-first-kwh-of-wind-energy-for-peru.html to the best of our knowledge Enel provided the whole investment cost from its own resources.

Original sector

Energy

Budget

Location

Country

Peru

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Power Generation (CCGT), Raw Materials, Government

Article published date

2024-06-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project