logo

Wayra Wind Farm

Sector: Wind • Location: Peru

Source: World Bank Group

Project
Active

The project envisages the construction and operation of a wind farm located in Marcona district, Ica region of Peru. Once completed, the project will feed 132 MW clean energy into the national grid. Enel is sponsoring the project through its subsidiary Enel Green Power Peru. On September 4th, 2017 construction works were initiated.

The new wind facility comprises 42 wind turbines of over 3 MW ea

Project Information FAQ

Project Information

4 Q
The project “Wayra Wind Farm” is an infrastructure initiative in the Wind sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project envisages the construction and operation of a wind farm located in Marcona district, Ica region of Peru. Once completed, the project will feed 132 MW clean energy into the national grid. Enel is sponsoring the project through its subsidiary Enel Green Power Peru. On September 4th, 2017 construction works were initiated. The new wind facility comprises 42 wind turbines of over 3 MW each and will be able to generate around 600 GWh per year, equivalent to the annual consumption needs of over 480,000 Peruvian households, while avoiding the emission of nearly 288,000 tonnes of CO2 into the atmosphere each year. Project is being developed on a BOO basis with a 20-year electricity supply contract signed with Peru’s Ministry of Energy and Mines. The Enel Group was awarded in 2016 the right to sign the energy supply contracts for Wayra I following the fourth public renewable energy tender launched by the Peruvian energy regulator OSINERGMIN, based on lowest tariff per unit of energy. Enel is building the farm with own resources. Total investment is estimated at $165 million. In February 2018, the facility started supplying electricity to the national grid. https://www.enelgreenpower.com/media/press/d/2017/09/enel-starts-construction-of-perus-largest-wind-farm https://www.enel.pe/en/media/news/d201802-wayra-i-generates-the-first-kwh-of-wind-energy-for-peru.html to the best of our knowledge Enel provided the whole investment cost from its own resources.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data