WBUD SR 58 Water & Sewer Line Crossing
Sector: Water Supply and Storage • Location: Kingston, Tennessee, United States of America
Source: Dodge
The work to be bid on is generally as follows: The project generally consists of the furnishing of all materials, equipment, and labor for the installation of approximately 1,300 linear feet of new 12-inch water line and approximately 1,300 linear feet of new 8-inch sewer force main hanging from beneath the existing bridge at the SR58 crossing of the Tennessee River in Kingston, TN. The project wi
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Bridge, Government, Commercial
- Location
- Kingston, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WBUD SR 58 Water & Sewer Line Crossing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be bid on is generally as follows: The project generally consists of the furnishing of all materials, equipment, and labor for the installation of approximately 1,300 linear feet of new 12-inch water line and approximately 1,300 linear feet of new 8-inch sewer force main hanging from beneath the existing bridge at the SR58 crossing of the Tennessee River in Kingston, TN. The project will also include all erosion control, excavation, grading, traffic control, and testing necessary ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Kingston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Bridge, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
