logo

WD Thermal Power Plant

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company WD Agroindustrial Ltda was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais, municipality of Joao Pinheiro.

A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE WD in April 2004. The company initially had a capacity of 12 MW and would not trade electricity in the regulat

Status
Prospective
Sector
Biomass, Geothermal, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about WD Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “WD Thermal Power Plant” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company WD Agroindustrial Ltda was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais, municipality of Joao Pinheiro. A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE WD in April 2004. The company initially had a capacity of 12 MW and would not trade electricity in the regulated market. This capacity was later increased to 18 MW. In April 2016, WD Agroindustrial Ltda. won the public bidding that took place in April 2016 by offering an average tariff of US$ 68.3/MWh (BRL 217.18/MWh). The project company signed 25-year power purchase agreements with the several electricity distribution companies. After winning the bidding process, the company was granted the authorization to increase the capacity of the power plant to 48 MW. The total investment in the expansion of the power plant was estimated at US$ 7.4 million (BRL 23.376 million). The construction works commenced in July 2016 and were in advanced stage as of June 2017.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Geothermal, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project