WD Thermal Power Plant
Sector: Commercial • Location: Brazil
Source: World Bank Group
The Brazilian company WD Agroindustrial Ltda was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais, municipality of Joao Pinheiro.
A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE WD in April 2004. The company initially had a capacity of 12 MW and would not trade electricity in the regulat
- Status
- Prospective
- Sector
- Commercial, Geothermal, Power Generation (CCGT), Government, Biomass
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WD Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company WD Agroindustrial Ltda was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais, municipality of Joao Pinheiro. A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE WD in April 2004. The company initially had a capacity of 12 MW and would not trade electricity in the regulated market. This capacity was later increased to 18 MW. In April 2016, WD Agroindustrial Ltda. won the public bidding that took place in April 2016 by offering an average tariff of US$ 68.3/MWh (BRL 217.18/MWh). The project company signed 25-year power purchase agreements with the several electricity distribution companies. After winning the bidding process, the company was granted the authorization to increase the capacity of the power plant to 48 MW. The total investment in the expansion of the power plant was estimated at US$ 7.4 million (BRL 23.376 million). The construction works commenced in July 2016 and were in advanced stage as of June 2017. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Power Generation (CCGT), Government, Biomass |
Article published date | 2024-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
