WD Thermal Power Plant

Sector: Government • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company WD Agroindustrial Ltda was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais, municipality of Joao Pinheiro.

A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE WD in April 2004. The company initially had a capacity of 12 MW and would not trade electricity in the regulat

Project Information FAQ

Project Information

5 Q
The project “WD Thermal Power Plant” is an infrastructure initiative in the Government sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company WD Agroindustrial Ltda was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais, municipality of Joao Pinheiro. A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE WD in April 2004. The company initially had a capacity of 12 MW and would not trade electricity in the regulated market. This capacity was later increased to 18 MW. In April 2016, WD Agroindustrial Ltda. won the public bidding that took place in April 2016 by offering an average tariff of US$ 68.3/MWh (BRL 217.18/MWh). The project company signed 25-year power purchase agreements with the several electricity distribution companies. After winning the bidding process, the company was granted the authorization to increase the capacity of the power plant to 48 MW. The total investment in the expansion of the power plant was estimated at US$ 7.4 million (BRL 23.376 million). The construction works commenced in July 2016 and were in advanced stage as of June 2017.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data