WEB2175/25 - 117, Killester Park, Dublin 5
Sector: Construction • Location: Ireland
The development will consist of (a) an increase in the width of the new dormer window at first floor level to the rear, granted permission under planning reference WEB1812/23. (b) the repositioning and increase in the width of the vehicular entrance to the front from 2.5metres to 3.5metres. (c) associated site works.
- Status
- Prospective
- Sector
- Construction
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about WEB2175/25 - 117, Killester Park, Dublin 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | decision notice issued |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The development will consist of (a) an increase in the width of the new dormer window at first floor level to the rear, granted permission under planning reference WEB1812/23. (b) the repositioning and increase in the width of the vehicular entrance to the front from 2.5metres to 3.5metres. (c) associated site works. |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
