Weizhou 5-3 Oilfield Development Project
Sector: Oil and Gas • Location: China
Source: Kalkine Media
The Weizhou 5-3 Oilfield Development Project is located in the Beibu Gulf Basin of the South China Sea. It includes a self-installing wellhead platform and plans for 10 development wells (7 production wells, 2 water injection wells, and 1 gas injection well). The project aims to achieve a plateau production of approximately 10,000 barrels of oil equivalent per day in 2026, producing medium crude o
- Status
- Under Construction
- Sector
- Oil and Gas, Water Supply and Storage
- Location
- China
- Updated
- 22 Jul 2026
- Source
- Kalkine Media
ConstructChat
Ask ConstructChat about Weizhou 5-3 Oilfield Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | on-stream |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Weizhou 5-3 Oilfield Development Project is located in the Beibu Gulf Basin of the South China Sea. It includes a self-installing wellhead platform and plans for 10 development wells (7 production wells, 2 water injection wells, and 1 gas injection well). The project aims to achieve a plateau production of approximately 10,000 barrels of oil equivalent per day in 2026, producing medium crude oil. |
Original sector | Energy |
Location
Country | China |
Source
Source | Kalkine Media |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Water Supply and Storage |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
