Wekiva Parkway
Sector: Road • Location: Florida, United States of America
Source: Build America Bureau (BAB) Projects
Authorized in 2004 by the Wekiva Parkway and Protection Act (Chapter 369, Part III, F.S.), the Wekiva Parkway project will complete the beltway around northwest metropolitan Orlando, Florida. The proposed 25-mile tolled expressway will connect to the existing S.R. 417 at I-4, providing an alternative to I-4 and relieving S.R. 46, US 441 and other area roads of traffic congestion resulting from int
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | credit agreement executed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Authorized in 2004 by the Wekiva Parkway and Protection Act (Chapter 369, Part III, F.S.), the Wekiva Parkway project will complete the beltway around northwest metropolitan Orlando, Florida. The proposed 25-mile tolled expressway will connect to the existing S.R. 417 at I-4, providing an alternative to I-4 and relieving S.R. 46, US 441 and other area roads of traffic congestion resulting from intensifying growth and travel between Orange, Lake, and Seminole Counties. The TIFIA loan will finance the CFX portion of the project, which consists of approximately 10 miles of the overall project to be constructed in 5 segments. The remaining 17 miles of the project will be constructed by the Florida Department of Transportation (FDOT) and will connect directly to the CFX project section(s). According to CFX, construction of the Parkway is estimated to generate more than 35,000 jobs over 8 years. Over the long term, the project will make it easier to travel between homes, schools, jobs, and recreational areas. The largely elevated Parkway is designed to separate intercounty traffic from those making local trips, reducing vehicle crashes and fatalities. Development of the expressway has included setting aside more than 3,400 acres of land for conservation. The Parkway also will include numerous wildlife bridges, and its elevation will reduce accidents between vehicles and wildlife. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
