logo
ProjectUnder Construction

Weld Energy Storage Project

One of 10,000+ projects Taiyo tracks in Colorado.

Source: AOL

The Weld Energy Storage project is Platte River Power Authority's first utility-scale battery storage system, designed to store 400 megawatt hours or 100 megawatts over four hours. It will allow PRPA to charge the battery when renewable energy is abundant and prices are low, and use it later when demand and prices are higher. Construction begins in May 2026, with a groundbreaking ceremony set for

Status
Under Construction
Sector
Energy Storage, Power Generation (CCGT), Solar, Power Transmission
Location
Fort Collins, Colorado, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about Weld Energy Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Weld Energy Storage Project” is an infrastructure initiative in the Energy Storage sector, located in Fort Collins, Colorado, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Weld Energy Storage project is Platte River Power Authority's first utility-scale battery storage system, designed to store 400 megawatt hours or 100 megawatts over four hours. It will allow PRPA to charge the battery when renewable energy is abundant and prices are low, and use it later when demand and prices are higher. Construction begins in May 2026, with a groundbreaking ceremony set for June 4, 2026. The project is located at the Severance substation, adjacent to the Black Hollow Sun solar project.

Original sector

Energy

Location

Country

United States of America (USA)

State

Colorado

City

Fort Collins

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Solar, Power Transmission

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project