Weldon Drive Water Main Replacement
Sector: Water Supply and Storage • Location: Camp Springs, Maryland, United States of America
Source: Dodge
Replacement of approximately 5,625 feet of 8-inch DIP water main, replacement of approximately 707 feet of 10-inch DIP water main, replacement of approximately 769 feet of 8-inch PVC sewer main, installation of 12 fire hydrants and 111 water house connections to serve Temple Hill Road, Weldon Drive, Harley Lane, Simmons Lane, Hope Drive, Summerhill Road, Cedell Place, Westridge Court, Cedell Court
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
- Location
- Camp Springs, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Weldon Drive Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of approximately 5,625 feet of 8-inch DIP water main, replacement of approximately 707 feet of 10-inch DIP water main, replacement of approximately 769 feet of 8-inch PVC sewer main, installation of 12 fire hydrants and 111 water house connections to serve Temple Hill Road, Weldon Drive, Harley Lane, Simmons Lane, Hope Drive, Summerhill Road, Cedell Place, Westridge Court, Cedell Court and Westridge Place in Temple Hills, Prince George s County, Maryland. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Camp Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
