Weldon Street at C-42R Culvert Replacement
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
This project is comprised of the removal, disposal, replacement, and restoration of culvert crossings along the Melbourne Tillman (MT) Water Control District (WCD) Canal on Weldon St @ C-42-R. Construction of the project will be a turn-key and will include all aspects of work including but not limited to: dewatering and utility permitting with MTWCD, furnishing and installing10 x 6 concrete box cu
- Status
- Closed
- Sector
- Power Transmission, Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Palm Bay, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Weldon Street at C-42R Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is comprised of the removal, disposal, replacement, and restoration of culvert crossings along the Melbourne Tillman (MT) Water Control District (WCD) Canal on Weldon St @ C-42-R. Construction of the project will be a turn-key and will include all aspects of work including but not limited to: dewatering and utility permitting with MTWCD, furnishing and installing10 x 6 concrete box culvert, headwall, all additional associated material as included in the plans and bid items, equip... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm Bay |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
