logo
ProjectClosed

Well #3 Motor and Pump Replacement

Closed · Texas · Last reported Feb 2025

Source: Dodge

#3 Well Motor and Pump Replacement, The City of Gainesville is requesting bids for the replacement of Well #3 Motor and Pump to recover production of the well at 300 GPM. Well #3: Contractor needs to acidize and swab the well screen then run a bailer to clean out well bore. Then install submersible equipment to increase production back to 300 GPM. In addition, include all electrical/concrete work

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Government, Cement, Manufacturing (Industrial)
Location
Callisburg, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Well 3 Motor and Pump Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Well 3 Motor and Pump Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Callisburg, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

#3 Well Motor and Pump Replacement, The City of Gainesville is requesting bids for the replacement of Well #3 Motor and Pump to recover production of the well at 300 GPM. Well #3: Contractor needs to acidize and swab the well screen then run a bailer to clean out well bore. Then install submersible equipment to increase production back to 300 GPM. In addition, include all electrical/concrete work to complete the install of the drive. Bid should include: Well #3 Acidize and swab well screen. R...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Callisburg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Government, Cement, Manufacturing (Industrial)

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project