logo
ProjectClosed

Well 3 Redevelopment Motor Replacement and Pump

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Summary Details: Redevelopment of Well #3, motor replacement, and pump rebuild is intended to secure the water source for the next 50+ years. The work to be undertaken generally consists of, but is no limited to the following: Re-develop Well #3 using mechanical and chemical methods. Remove and replace pump motor and rebuild the pump Establish reliable as-constructed and maintenance records for We

Status
Closed
Sector
Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Waste Processing and Treatment
Location
Gold River, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Well 3 Redevelopment Motor Replacement and Pump

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Well 3 Redevelopment Motor Replacement and Pump” is an infrastructure initiative in the Water Supply and Storage sector, located in Gold River, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Summary Details: Redevelopment of Well #3, motor replacement, and pump rebuild is intended to secure the water source for the next 50+ years. The work to be undertaken generally consists of, but is no limited to the following: Re-develop Well #3 using mechanical and chemical methods. Remove and replace pump motor and rebuild the pump Establish reliable as-constructed and maintenance records for Well #3

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Gold River

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Chemical (Industrial), Commercial, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project