logo
ProjectClosed

Well 5 Completion and Site Work

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: Dodge USA

The project will connect the recently drilled Well 5 to the existing White Rock raw water system that feeds the Oxford Water Treatment Plant. The work includes the supply and installation of: a submersible well pump, check valve, and drop pipe, pitless adapter, and surface seal; site improvements including grading and pavement; 150 mm dia. water main on Anderson Street; mechanical piping kiosk inc

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Road, Government, Commercial, Waste Processing and Treatment
Location
White Rock, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Well 5 Completion and Site Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Well 5 Completion and Site Work” is an infrastructure initiative in the Water Supply and Storage sector, located in White Rock, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will connect the recently drilled Well 5 to the existing White Rock raw water system that feeds the Oxford Water Treatment Plant. The work includes the supply and installation of: a submersible well pump, check valve, and drop pipe, pitless adapter, and surface seal; site improvements including grading and pavement; 150 mm dia. water main on Anderson Street; mechanical piping kiosk including check valve and flow meter; electrical/control kiosk, including control panels, VFDs, HVAC...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

White Rock

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Road, Government, Commercial, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project