Well 7A Equipping
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Work shall consist of, but not limited to furnishing all materials, equipment, tools, labor, and incidentals to equip a new 500 horsepower municipal water well. Work shall generally include civil/site work; sound enclosure and foundation; deep well vertical turbine pump, motor, and support pedestal; above and below ground valves and piping; electrical and instrumentation; startup testing and t
- Status
- Closed
- Sector
- Wind, Government, Power Generation (CCGT), Rail, Water Supply and Storage, Consumer Products, Commercial, Waste Processing and Treatment
- Location
- Anaheim, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Well 7A Equipping
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work shall consist of, but not limited to furnishing all materials, equipment, tools, labor, and incidentals to equip a new 500 horsepower municipal water well. Work shall generally include civil/site work; sound enclosure and foundation; deep well vertical turbine pump, motor, and support pedestal; above and below ground valves and piping; electrical and instrumentation; startup testing and training; preparing O&M manuals and all related work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Anaheim |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Government, Power Generation (CCGT), Rail, Water Supply and Storage, Consumer Products, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- 110 North Wacker
- Ruby Run Tentative Subdivision Map, Special Development Permit, Affordable Housing Plan and Abandonment
- Meadows Field Airport Taxiway G Rehabilitation and
- Abandonment Of Excess Right-Of-Way Fronting 7721 Winding Way
- Lynn's School of English ZV Letter
- 4212 Winding Way
- Oglala Sioux Tribe Broadband Project
- Construction of 525 rental housing units in 4 blocks in the Medina de Cuatro Vientos, Madrid (Spain)
