logo

Well 8 & 9 Transmission Improvements

Sector: Water Supply and Storage • Location: Pekin, Illinois, United States

Source: Business Wire

Project
Completed

This project installed approximately 8,800 feet of 12-inch and 16-inch water main along various streets to increase the capacity and reliability of the water distribution system in Pekin. The improvements were completed in 2024 at a cost of approximately $4.74 million.

Status
Closed
Sector
Water Supply and Storage, Residential
Location
Pekin, Illinois, United States of America
Updated
22 Jul 2026
Source
Business Wire

ConstructChat

Ask ConstructChat about Well 8 & 9 Transmission Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Well 8 & 9 Transmission Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Pekin, Illinois, United States. Taiyo aggregates data on it from Business Wire.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project installed approximately 8,800 feet of 12-inch and 16-inch water main along various streets to increase the capacity and reliability of the water distribution system in Pekin. The improvements were completed in 2024 at a cost of approximately $4.74 million.

Original sector

Utilities

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Pekin

Source

Source

Business Wire

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project