logo

Well 9 Replacement

Sector: Waste Processing and Treatment • Location: Bremerton, Washington, United States of America

Source: City of Bremerton

Project
Closed

The original Well 9 was drilled in 1977 but was shut down in 2010 due to concerns with excessive sand production in the well. The City still maintains water rights to this location and will be drilling a new well next to the existing well to provide additional sources for the City’s water system. The wells in this area supply much of the water to East Bremerton. The City will first develop the sit

Project Information FAQ

Project Information

4 Q
The project “Well 9 Replacement” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Bremerton, Washington, United States of America. Taiyo aggregates data on it from City of Bremerton.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The original Well 9 was drilled in 1977 but was shut down in 2010 due to concerns with excessive sand production in the well. The City still maintains water rights to this location and will be drilling a new well next to the existing well to provide additional sources for the City’s water system. The wells in this area supply much of the water to East Bremerton. The City will first develop the site so that it will be accessible for large well drilling rigs. Follow-on projects include well drilling and adding facilities to the site for chlorine addition and well protection. Project Status (March 24, 2023) Nova Contracting is currently under contract to develop the site by constructing two retaining walls and gravel pad. This works is anticipated for completion in mid-April. The well drilling contract is currently being prepared and likely to go to bid later this spring or early summer 2023.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data