logo

Well No. 1 and Well No. 3 Construction

Sector: Commercial • Location: Laurel Hill, Florida, United States of America

Source: Dodge USA

Project
Bid Results

The project consists of: Replacement of approximately 425 LF of 6 asbestos cement waterline with new 6 PVC waterline. Rehabilitation of Well No. 1 to include motor, pump and column replacement, well casing rehabilitation, chlorination equipment replacement, building renovation, generator replacement and new electrical controls. Replacement of the upper shaft at well No. 3

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government
Location
Laurel Hill, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Well No. 1 and Well No. 3 Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Well No. 1 and Well No. 3 Construction” is an infrastructure initiative in the Commercial sector, located in Laurel Hill, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of: Replacement of approximately 425 LF of 6 asbestos cement waterline with new 6 PVC waterline. Rehabilitation of Well No. 1 to include motor, pump and column replacement, well casing rehabilitation, chlorination equipment replacement, building renovation, generator replacement and new electrical controls. Replacement of the upper shaft at well No. 3

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Laurel Hill

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Government

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project