logo

Well No. 11 Facility Contract 1

Sector: Chemical (Industrial) • Location: Belvidere, Illinois, United States of America

Source: Dodge

Project
Closed

Construction of the Well No. 11 facility, which includes iron treatment, chemical disinfection, reservoir water storage, booster pumps, and a generator.

Status
Closed
Sector
Chemical (Industrial), Waste Processing and Treatment, Water Supply and Storage, Metal, Manufacturing (Industrial), Commercial, Government, Steel
Location
Belvidere, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Well No. 11 Facility Contract 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Well No. 11 Facility Contract 1” is an infrastructure initiative in the Chemical (Industrial) sector, located in Belvidere, Illinois, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of the Well No. 11 facility, which includes iron treatment, chemical disinfection, reservoir water storage, booster pumps, and a generator.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Belvidere

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Chemical (Industrial), Waste Processing and Treatment, Water Supply and Storage, Metal, Manufacturing (Industrial), Commercial, Government, Steel

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project