Well No. 33 Rehabilitation
Sector: Water Supply and Storage • Location: Albany, Georgia, United States of America
Source: Dodge USA
Test pumping of existing well to determine current yield. Pull existing pump (contractor shall record pump serial number from pump bowl and coordinate with manufacturer to provide existing pump curve) and perform video inspection of existing well. Demolish existing discharge piping and valves and replace with new piping & valves as shown on plan sheets to match up to new pump support base. Pump mo
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Government
- Location
- Albany, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Well No. 33 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Test pumping of existing well to determine current yield. Pull existing pump (contractor shall record pump serial number from pump bowl and coordinate with manufacturer to provide existing pump curve) and perform video inspection of existing well. Demolish existing discharge piping and valves and replace with new piping & valves as shown on plan sheets to match up to new pump support base. Pump modifications including: removal, rebuilding, and re-installation of re-built 150 hp motor, install... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Albany |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
