Well Transmission System
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Installation of 7 well heads, approximately 5,260 feet of HDPE lateral and trunk lines, vaults, control building, SCADA, VFDs, power connections and connection to existing infrastructure at the City of Buffalo Water Treatment Plant.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Waste Processing and Treatment
- Location
- Buffalo, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Well Transmission System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of 7 well heads, approximately 5,260 feet of HDPE lateral and trunk lines, vaults, control building, SCADA, VFDs, power connections and connection to existing infrastructure at the City of Buffalo Water Treatment Plant. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Buffalo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
