Wellington Gateway Project
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The project consists of the construction of a complete Rapid Transit corridor along the length of Wellington Road, a primary arterial route into the City of London’s core - in Ontario. The project scope includes: o Reconstruction of up to 6.8 km of roadway between downtown and Highway 401, including widening to establish continuous transit lanes, multi-use paths, bike lanes and sidewalks, tota
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of the construction of a complete Rapid Transit corridor along the length of Wellington Road, a primary arterial route into the City of London’s core - in Ontario. The project scope includes: o Reconstruction of up to 6.8 km of roadway between downtown and Highway 401, including widening to establish continuous transit lanes, multi-use paths, bike lanes and sidewalks, totaling up to 15.4 km of infrastructure which will act as first-mile and last-mile connections to the proposed rapid transit corridors o Installation of intelligent traffic signals including transit signal priority, sensors and video cameras at up to 15 signalized intersections, as well as equipment for up to 5 buses. o Construction of 1 park-and-ride facility near Highway 401 o Widening of Clarke’s Bridge for additional two traffic lanes and a multi-use path (87 metres) o Installation of up to 18 transit stations o Purchase of up to 5 new buses o Replacement of up to 800 metres of storm sewer, up to 700 metres of sanitary sewer and up to 1000 metres of water main due to direct conflict with rapid transit construction |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
