logo
ProjectUnder Construction

Wellington Gateway Rapid Transit Project Phase 2

The owner, status and timeline of this project. A free account opens every field.

Source: Ontario Construction News

The Wellington Gateway rapid transit project aims to improve transit frequency and reliability along Wellington Road by widening about six kilometres of roadway between downtown London and Highway 401 to add continuous, dedicated transit-only lanes. Phase 2A covers Wellington Road from Wilkins Street to Base Line Road East, with full construction expected to begin in early April 2026. Phase 2B, fr

Status
Under Construction
Sector
Road
Location
London, Ontario, Canada
Updated
22 Jul 2026
Source
Ontario Construction News

ConstructChat

Ask ConstructChat about Wellington Gateway Rapid Transit Project Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Wellington Gateway Rapid Transit Project Phase 2” is an infrastructure initiative in the Road sector, located in London, Ontario, Canada. Taiyo aggregates data on it from Ontario Construction News.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Wellington Gateway rapid transit project aims to improve transit frequency and reliability along Wellington Road by widening about six kilometres of roadway between downtown London and Highway 401 to add continuous, dedicated transit-only lanes. Phase 2A covers Wellington Road from Wilkins Street to Base Line Road East, with full construction expected to begin in early April 2026. Phase 2B, from Watson Street to Base Line Road East, is planned for later in 2026, with contracts to be tendered later in the year. The project includes safety improvements, multi-use paths, transit signal priority, upgraded traffic systems, enhanced streetscapes, and replacement of aging underground infrastructure. Construction of remaining phases is expected to continue through 2027, with Phase 2 construction continuing through 2028 and final cleanup and restoration work extending into the same year.

Original sector

Transportation

Location

Country

Canada

State

Ontario

City

London

Source

Source

Ontario Construction News

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-03-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project