logo
ProjectClosed

Wellington Point Boat Launch

Closed · British Columbia · Last reported Oct 2024

Source: Dodge

The City of Delta is so liciting proposals from qualified marine structural engineering firms, or i ndividuals, with recent relevant experience in the design of boat ramp syst ems, to lead the preliminary and detailed design of a replacement boat laun ch ramp for the Wellington Point Boat Launch.

Status
Closed
Sector
Manufacturing (Industrial), Government, Commercial
Location
Delta, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Wellington Point Boat Launch

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wellington Point Boat Launch” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Delta, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Delta is so liciting proposals from qualified marine structural engineering firms, or i ndividuals, with recent relevant experience in the design of boat ramp syst ems, to lead the preliminary and detailed design of a replacement boat laun ch ramp for the Wellington Point Boat Launch.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Delta

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Government, Commercial

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project