WELSH WATER AND WASTEWATER AMP5 - II
Sector: Water Supply and Storage • Location: United Kingdom
Source: European Investment Bank (EIB)
Welsh Water provides 3.2 million people in Wales and adjoining areas of England with drinking water and sanitation. The Programme comprises Improvements to water supply and wastewater collection and treatment as part of the second half of Welsh Water's regulatory investment programme AMP5 (Asset Management Plan 5). The Programme was approved by the economic regulator OFWAT in 2009. The Programme
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about WELSH WATER AND WASTEWATER AMP5 - II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | fully disbursed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Welsh Water provides 3.2 million people in Wales and adjoining areas of England with drinking water and sanitation. The Programme comprises Improvements to water supply and wastewater collection and treatment as part of the second half of Welsh Water's regulatory investment programme AMP5 (Asset Management Plan 5). The Programme was approved by the economic regulator OFWAT in 2009. The Programme includes a significant programme of measures to increase the resilience and performance of drinking |
Original sector | Water, sewerage |
Location
Country | United Kingdom (UK) |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United Kingdom
- Brigg Biomass Power Plant North Lincolnshire
- Gas to the West Project
- River Humber Gas Pipeline Replacement Project, North Lincolnshire
- Horse Hill Oil Field, Surrey
- Nestle Ski Yoghurt Line Expansion, Cuddington, Cheshire
- Costa Coffee Roastery, Basildon, Essex, UK
- Aulds Frozen Foods, New Manufacturing Plant, Inchinnan, Scotland
- Sealord Fish Processing, Caistor
