logo
ProjectClosed

Wembley Pumphouse Electrical Upgrades

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

BASE has completed the majority of detailed design to replace the fire pump angle drive, install a new generator, extend the existing pumphouse, and consolidate electrical and instrumentation panels from a separate building to the new extension. The generator and angle drive are on order. Construction of the building extension began in September and is nearing completion. This RFP is for the remai

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment
Location
Grande Prairie, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wembley Pumphouse Electrical Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wembley Pumphouse Electrical Upgrades” is an infrastructure initiative in the Commercial sector, located in Grande Prairie, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BASE has completed the majority of detailed design to replace the fire pump angle drive, install a new generator, extend the existing pumphouse, and consolidate electrical and instrumentation panels from a separate building to the new extension. The generator and angle drive are on order. Construction of the building extension began in September and is nearing completion. This RFP is for the remainder of the Electric. This involves: 1. Perform all the work shown on the drawings and specs 2. I...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Grande Prairie

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project