logo

Wendeng Biomass Electricity and heat Cogeneration Plant

Active · China

Source: World Bank Group

Project
Active

The project entails the construction of a 300,000 tpa WtE plant in Weihai, Shandong Province. Total investment stands at RMB 330 million or $ 48.19 million. SPV is China Everbright Greentech Limited, a wholly owned subsidiary of the sponsor China Everbright. The facility will be undertaken under BOO concession. The project is designed to have an annual biomass processing capacity of 300,000 tonnes

Status
Prospective
Sector
Biomass, Power Generation (CCGT), Government, Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Wendeng Biomass Electricity and heat Cogeneration Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Wendeng Biomass Electricity and heat Cogeneration Plant” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a 300,000 tpa WtE plant in Weihai, Shandong Province. Total investment stands at RMB 330 million or $ 48.19 million. SPV is China Everbright Greentech Limited, a wholly owned subsidiary of the sponsor China Everbright. The facility will be undertaken under BOO concession. The project is designed to have an annual biomass processing capacity of 300,000 tonnes, and is expected to generate around 180,000,000 kWh of green electricity annually. Financial close took place on June 26, 2017. http://doc.irasia.com/listco/hk/greentech/press/p170626.pdf Acucomm files

Original sector

Energy

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project