Wengeng Buyuan Water System Connectivity Project
Sector: Commercial • Location: China
Source: World Bank Group
The project of connecting the Wenshui source water system. The length of the project of Jining City's Yongwen Buyuan Water System Connection Project is 60.325km, and the diversion flow rate is 10m3~7.54m3/s. The project includes water diversion channel engineering, water storage and recharge project, cross building project and information engineering. Total investment stands at $ 45.32 million. Ty
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Waste Processing and Treatment
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Wengeng Buyuan Water System Connectivity Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project of connecting the Wenshui source water system. The length of the project of Jining City's Yongwen Buyuan Water System Connection Project is 60.325km, and the diversion flow rate is 10m3~7.54m3/s. The project includes water diversion channel engineering, water storage and recharge project, cross building project and information engineering. Total investment stands at $ 45.32 million. Type of concession is BOT while the contract period is 25 years. Financial close took place on April 3, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=94ef8bade58f48f499d526c47b15b587 |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Transmission, Government, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in China
- Black Point Combined Cycle Power Plant Hong Kong
- Hongyanhe Nuclear Power Plant Liaoning
- Yangcheng CoalFired Power Plant Shanxi Province
- Tianhuangping PumpedStorage Hydro Plant
- Xiangjiaba Hydropower Plant
- Fuqing Nuclear Power Plant Fujian
- Huoqiu County Pipeline Gas Project
- Fuchuan Xiehe Shijia Wind Power Plant
