Wenji Township Wastewater Treatment Plant
Sector: Mass Transit • Location: China
Source: World Bank Group
The main construction contents of this project include the construction, operation, maintenance and construction, operation and maintenance of the water treatment project of the township sewage treatment project in Yuquan District, Puyang City. Among them, the sewage treatment project includes: the planned construction of the sewage town of Xingliu Township is on the west side of the Ganhe River,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The main construction contents of this project include the construction, operation, maintenance and construction, operation and maintenance of the water treatment project of the township sewage treatment project in Yuquan District, Puyang City. Among them, the sewage treatment project includes: the planned construction of the sewage town of Xingliu Township is on the west side of the Ganhe River, south of the flow center ditch, north of the Wuzhuang Datang, and the new east bank of Xiqiao, with a total area of ??about 15 mu. The Wuming Township Wastewater Treatment Plant is planned to be built on the west side of the Vortex River, on the north side of the No. 3 Road, and on the east side of the Beijing-Kowloon Railway, covering an area of ??22.5 mu. The Wenji Township Wastewater Treatment Plant is planned to be built in the north of Wudaogou, west of the 105 National Highway, and east of the main canal, covering an area of ??about 15 mu. The Ninglaozhuang Township Wastewater Treatment Plant is planned to be built in the east of the outer ring road, north of Honghaigou and south of Ningsu Road, covering an area of ??about 21 mu. The construction of the water environment treatment project includes the following items: earthwork, culvert, pumping station, bridge project, dike project, ecological revetment project, environmental protection and water conservation project. BOT is the type of concession with a contract period of 20 years. Financial close took place on March 30, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=ef2d962b6ce1429eb37924271af3cbcd |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
