Wesley Seale Dam Dewatering Spillway Gate Rehabilitation
Sector: Commercial • Location: Sandia, Texas, United States of America
Source: Dodge USA
Scope of Work is described in general, non-inclusive terms as: 1. Install Dewatering System a. Fabrication of stoplogs and parts b. Installation of stoplogs c. Commissioning of stoplogs d. Install gantry crane e. Install stoplog guide channel assembly f. Remove existing stairs g. Install crane rail h. Install bridge deck grating i. Perform pier and ogee modifications j. Install ogee sill plates k.
- Status
- Under Construction
- Sector
- Commercial, Bridge, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Rail, Government, Waste Processing and Treatment, Water Supply and Storage
- Location
- Sandia, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wesley Seale Dam Dewatering Spillway Gate Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work is described in general, non-inclusive terms as: 1. Install Dewatering System a. Fabrication of stoplogs and parts b. Installation of stoplogs c. Commissioning of stoplogs d. Install gantry crane e. Install stoplog guide channel assembly f. Remove existing stairs g. Install crane rail h. Install bridge deck grating i. Perform pier and ogee modifications j. Install ogee sill plates k. Perform electrical modifications 2. Installation of new spillway crest gates a. Remove gates 1 a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Sandia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Rail, Government, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
