West 70th St Improvements
Sector: Water Supply and Storage • Location: Eden Prairie, Minnesota, United States of America
Source: Dodge USA
Project includes, but is not limited to the following: Remove Bituminous Pavement 3,280 Sq Yd Excavation (Common and Subgrade) 2,854 Cu Yd Common Embankment 822 Cu Yd Aggregate Base (CV) Class 5 1,850 Cu Yd Type SP 9.5 and 12.5 Wear and Non Wear Course 1,540 Ton Subgrade Preparation 11 Road Sta RC Pipe Sewer Des 3006 (15 - 60 inch) 142 Lin Ft Drainage Structures 6 Each Concrete Walk 13,230 Sq Ft 2
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Eden Prairie, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West 70th St Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project includes, but is not limited to the following: Remove Bituminous Pavement 3,280 Sq Yd Excavation (Common and Subgrade) 2,854 Cu Yd Common Embankment 822 Cu Yd Aggregate Base (CV) Class 5 1,850 Cu Yd Type SP 9.5 and 12.5 Wear and Non Wear Course 1,540 Ton Subgrade Preparation 11 Road Sta RC Pipe Sewer Des 3006 (15 - 60 inch) 142 Lin Ft Drainage Structures 6 Each Concrete Walk 13,230 Sq Ft 2.5" Bituminous Walk 360 Sq Ft Concrete Curb and Gutter 2,270 Lin Ft Lighting Unit Type Special 17... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Eden Prairie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
