To further develop the West African Power System (WAPP), a transmission line with a total length of around 1360 km, including twelve substations, is to be built as part of the Côte d'Ivoire - Liberia - Sierra Leone - Guinea (CLSG) Power System Redevelopment Subprogram, connecting these four countries. The measure is one of the WAPP priority projects and integrates Liberia, Sierra Leone and Guinea

Project Information FAQ

Project Information

5 Q
The project “West African Energy Interconnection WAPP - Côte d'Ivoire-Liberia-Sierra Leone-Guinea (CLSG) II transmission line” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Liberia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To further develop the West African Power System (WAPP), a transmission line with a total length of around 1360 km, including twelve substations, is to be built as part of the Côte d'Ivoire - Liberia - Sierra Leone - Guinea (CLSG) Power System Redevelopment Subprogram, connecting these four countries. The measure is one of the WAPP priority projects and integrates Liberia, Sierra Leone and Guinea into the regional network between Nigeria and Senegal. The German contribution focuses on a section in Liberia. The aim is to finance the construction of a new substation at the Yekepa site, which will complement three substations that have already been examined and financed by German Financial Cooperation (Monrovia, Buchanan, Mano; project no. 27171 / BMZ no. 201067198). The CLSG measure is being implemented in cooperation with the World Bank, the EIB and the AfDB. The total cost of the measure is estimated at around EUR 385 million in a first phase (masts, 1st line, substations) and a further EUR 59 million in a second phase (2nd line, upgrading of substations). The German side is to provide Liberia with an FC grant of EUR 59 million (EUR 10 million for the current measure + EUR 18 million increase, EUR 31 million for substations already inspected) to finance the first phase. The recipient of the German contribution is the Liberian state.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data