West Area Water Quality Control Facility – Outfall Improvements
On-hold / design · Georgia
Source: Atlanta Watershed
The outfall to the West Area Water Quality Control Facility (WQCF) overflow tunnel is located at the R.M. Clayton WRC at northwest Bolton Road, adjacent to the Nancy Creek Pump station. It serves the West Area WQCF tunnel and pump station which takes flows from the North Avenue, Clear Creek and Tanyard Creek Combined Sewer Basins. It is designed to release flow to Peachtree Creek when the tunnel i
- Status
- Failure
- Sector
- Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Atlanta Watershed
ConstructChat
Ask ConstructChat about West Area Water Quality Control Facility – Outfall Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | on-hold / design |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The outfall to the West Area Water Quality Control Facility (WQCF) overflow tunnel is located at the R.M. Clayton WRC at northwest Bolton Road, adjacent to the Nancy Creek Pump station. It serves the West Area WQCF tunnel and pump station which takes flows from the North Avenue, Clear Creek and Tanyard Creek Combined Sewer Basins. It is designed to release flow to Peachtree Creek when the tunnel is full to protect the pump station if the upstream tunnel influent gates fail to close at any of the CSCF facilities. While these events are very rare, the outfall to the West Area WQCF overflow tunnel is necessary to prevent excessive damage to the WQCF and/or RM Clayton WRC. The scope of this project includes: Removing grout and sediment in Peachtree Creek Grouting the outfall foundation Installing a concrete plunge pool to dampen velocities in the concrete channel Lining the remainder of the channel to Peachtree Creek |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Atlanta Watershed |
URL |
More Details
Record type | Project |
Sector | Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Government |
Article published date | 2023-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America (USA)
- Intrenchment Creek Viaduct Rehabilitation
- Bolton Road & Phillip Lee Pump Stations Rehabilitation
- Clear Creek Chemical System Improvements (Bid Package 1) and System-wide Flow
- Custer Avenue Combined Sewer Control Facility – Additional Screens
- Division Street/Route 65 Interchange Project
- Sorrels Overpass Over I-70
- Route 39 Railroad Crossing Improvements/Overpass/Quiet Zone
- I-44 Rebuild at MO 744/Mulroy Road
