logo

West Area Water Quality Control Facility – Outfall Improvements

Sector: Cement • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
On-Hold / Design

The outfall to the West Area Water Quality Control Facility (WQCF) overflow tunnel is located at the R.M. Clayton WRC at northwest Bolton Road, adjacent to the Nancy Creek Pump station. It serves the West Area WQCF tunnel and pump station which takes flows from the North Avenue, Clear Creek and Tanyard Creek Combined Sewer Basins. It is designed to release flow to Peachtree Creek when the tunnel i

Project Information FAQ

Project Information

5 Q
The project “West Area Water Quality Control Facility – Outfall Improvements” is an infrastructure initiative in the Cement sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

on-hold / design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The outfall to the West Area Water Quality Control Facility (WQCF) overflow tunnel is located at the R.M. Clayton WRC at northwest Bolton Road, adjacent to the Nancy Creek Pump station. It serves the West Area WQCF tunnel and pump station which takes flows from the North Avenue, Clear Creek and Tanyard Creek Combined Sewer Basins. It is designed to release flow to Peachtree Creek when the tunnel is full to protect the pump station if the upstream tunnel influent gates fail to close at any of the CSCF facilities. While these events are very rare, the outfall to the West Area WQCF overflow tunnel is necessary to prevent excessive damage to the WQCF and/or RM Clayton WRC. The scope of this project includes: Removing grout and sediment in Peachtree Creek Grouting the outfall foundation Installing a concrete plunge pool to dampen velocities in the concrete channel Lining the remainder of the channel to Peachtree Creek

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data