logo
ProjectOn-Hold / Design

West Area Water Quality Control Facility – Outfall Improvements

On-hold / design · Georgia

Source: Atlanta Watershed

The outfall to the West Area Water Quality Control Facility (WQCF) overflow tunnel is located at the R.M. Clayton WRC at northwest Bolton Road, adjacent to the Nancy Creek Pump station. It serves the West Area WQCF tunnel and pump station which takes flows from the North Avenue, Clear Creek and Tanyard Creek Combined Sewer Basins. It is designed to release flow to Peachtree Creek when the tunnel i

Status
Failure
Sector
Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Atlanta Watershed

ConstructChat

Ask ConstructChat about West Area Water Quality Control Facility – Outfall Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “West Area Water Quality Control Facility – Outfall Improvements” is an infrastructure initiative in the Cement sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Participants

Sponsoring Agency

Status

Original status

on-hold / design

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The outfall to the West Area Water Quality Control Facility (WQCF) overflow tunnel is located at the R.M. Clayton WRC at northwest Bolton Road, adjacent to the Nancy Creek Pump station. It serves the West Area WQCF tunnel and pump station which takes flows from the North Avenue, Clear Creek and Tanyard Creek Combined Sewer Basins. It is designed to release flow to Peachtree Creek when the tunnel is full to protect the pump station if the upstream tunnel influent gates fail to close at any of the CSCF facilities. While these events are very rare, the outfall to the West Area WQCF overflow tunnel is necessary to prevent excessive damage to the WQCF and/or RM Clayton WRC. The scope of this project includes: Removing grout and sediment in Peachtree Creek Grouting the outfall foundation Installing a concrete plunge pool to dampen velocities in the concrete channel Lining the remainder of the channel to Peachtree Creek

Budget

Location

Country

United States of America (USA)

State

Georgia

Source

Source reliability

High

Source

Atlanta Watershed

URL

More Details

Record type

Project

Sector

Cement, Tunnel, Waste Processing and Treatment, Water Supply and Storage, Road, Government

Article published date

2023-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project