West Ashbridge Street Culvert Maintenance and Repair REBID
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge USA
The project includes providing all labor, materials and equipment to complete the construction of the maintenance and repairs to the West Ashbridge Street Culvert in West Chester, PA. Project includes replacement of the existing western corrugated metal pipe arch with elliptical reinforced concrete pipe, repair and rehabilitation with geopolymer lining of the eastern corrugated metal pipe and conc
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Rail, Commercial, Road, Mass Transit, Metal, Cement, Government
- Location
- West Chester, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Ashbridge Street Culvert Maintenance and Repair REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes providing all labor, materials and equipment to complete the construction of the maintenance and repairs to the West Ashbridge Street Culvert in West Chester, PA. Project includes replacement of the existing western corrugated metal pipe arch with elliptical reinforced concrete pipe, repair and rehabilitation with geopolymer lining of the eastern corrugated metal pipe and concrete box culvert extension, repair of the downstream headwall, removal of the existing upstream h... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | West Chester |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Rail, Commercial, Road, Mass Transit, Metal, Cement, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
