West Avenue D Extension
Sector: Water Supply and Storage • Location: Belton, Texas, United States of America
Source: Dodge USA
West Avenue D Extension Loop 121 to Kennedy Court Belton, Texas. This project includes, but is not limited to, replacement of approximately 8,050 square yards of 4 Type B HMAC and 2 Type D HMAC, 10,000 square yards of moisture conditioned subgrade, 6 crushed limestone base material and geogrid, 3,550 linear feet of curb and gutter, concrete radius units, valley gutters, sidewalks, driveway approac
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Raw Materials, Manufacturing (Industrial)
- Location
- Belton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Avenue D Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | West Avenue D Extension Loop 121 to Kennedy Court Belton, Texas. This project includes, but is not limited to, replacement of approximately 8,050 square yards of 4 Type B HMAC and 2 Type D HMAC, 10,000 square yards of moisture conditioned subgrade, 6 crushed limestone base material and geogrid, 3,550 linear feet of curb and gutter, concrete radius units, valley gutters, sidewalks, driveway approaches, striping, 4 precast light foundations, 500 linear feet of 2 PVC Schedule 40 conduit with pul... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Belton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial, Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
