West Bank and Gaza Southern Area Water and Sanitation Improvement Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In April 1999, Geka, a joint venture between France's Vivendi Water (known as Veolia Environnement as of May 2003) and the local Khatib & Alami, was awarded a 4-year management contract for the water and wastewater services in the southern part of the territory controlled by the Palestinian Authority. Under the contract, Vivendi was to work as a shadow utility with the water operators of Bethlehem
- Status
- Closed
- Sector
- Water Supply and Storage, Advanced Electronics, Rail, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT)
- Location
- West Bank and Gaza
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about West Bank and Gaza Southern Area Water and Sanitation Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 1999, Geka, a joint venture between France's Vivendi Water (known as Veolia Environnement as of May 2003) and the local Khatib & Alami, was awarded a 4-year management contract for the water and wastewater services in the southern part of the territory controlled by the Palestinian Authority. Under the contract, Vivendi was to work as a shadow utility with the water operators of Bethlehem, with 87,000 consumers, and Hebron, with over 200,000, as well as nearly 30 small communities. Geka was to enhance efficiency and rapidly improve service quality and quantity of water supply and wastewater services. Bethlehem already had an operator, the Water Supply & Sewerage Authority (WSSA) within the Ministry of Local Government. Geka was to lead the continuing development of WSSA. Activities included leakage control, network rehabilitation, and a program to reduce unaccounted-for water from 50% to below 25% by replacing/repairing water meters and pipes. The cost of the management contract itself was estimated at US$11.8 million. The overall project was financed with a US$21 million loan from the World Bank and US$35.7 million loan from the EIB. In the first year of the contract, Geka installed about 600 water meters and made a similar number of service connections. Pumps were installed and rehabilitated at the Beit Fajar Well in Bethlehem and a new data processing system was set up. A laboratory was built to test water quality and chlorination units were introduced. Pressure sensors were placed in the network to control distribution and a big leakage campaign was launched with the focus on the bulk transmission line. Alongside the physical upgrade, attention was given to training local staff working for the client and local municipal bodies. New procedures were also introduced. However, Vivendi's contract was terminated by mutual agreement with WSSA (the owner) because of the deteriorated security situation in the contract area. Vivendi left on December 31, 2002. None None |
Original sector | Water and sewerage |
Location
Country | West Bank and Gaza |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Advanced Electronics, Rail, Power Transmission, Government, Waste Processing and Treatment, Power Generation (CCGT) |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in West Bank and Gaza
- Gaza Strip Water and Wastewater Treatment Services
- Nakheel Palestine for Agricultural Investment
- Solomon Pools Company
- Natures' Produce for Agricultural Investment and Marketing Company (Thimar)
- West Bank and Gaza Southern Area Water and Sanitation Improvement Project
- PRICO Operations Rooftop Solar
- SEF Al-Ayyam Printing Company
- PRICO Solar Gaza
