West Bartow Wastewater Treatment Facility
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Construction Management at Risk services for the construction of a 2.0 MGD Wastewater Treatment Facility and discharge diffuser into the Etowah River. The Project Scope shall include but is not limited to the design of an Influent Pump Station, EQ Tank, EQ Pump Station, Odor Control System, Bioreactor, Membrane Filtration System, UV Disinfection, Aerobic Sludge Holding Tank, Dewatering Facility, C
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Cartersville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Bartow Wastewater Treatment Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction Management at Risk services for the construction of a 2.0 MGD Wastewater Treatment Facility and discharge diffuser into the Etowah River. The Project Scope shall include but is not limited to the design of an Influent Pump Station, EQ Tank, EQ Pump Station, Odor Control System, Bioreactor, Membrane Filtration System, UV Disinfection, Aerobic Sludge Holding Tank, Dewatering Facility, Cascade Aeration, Chemical Feed System and Effluent Discharge Structure for the entire max month a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Cartersville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
