logo

West Calgary Ring Road, Alberta

Sector: Automotive • Location: Canada

Source: Road Traffic Technology

Project
Closed

The West Calgary Ring Road is being built between Trans-Canada Highway and Highway 8 in Alberta, Canada. Credit: Government of Alberta. The project includes three sections: North project, South project and Bow River Bridge. Credit: Coolcaesar. The West Calgary Ring road will be opened to traffic in 2024. Credit: AlvinTo2000. The West Calgary Ring Road is a 9km-long section of Calgary Ring Road bei

Project Information FAQ

Project Information

5 Q
The project “West Calgary Ring Road, Alberta” is an infrastructure initiative in the Automotive sector, located in Canada. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The West Calgary Ring Road is being built between Trans-Canada Highway and Highway 8 in Alberta, Canada. Credit: Government of Alberta. The project includes three sections: North project, South project and Bow River Bridge. Credit: Coolcaesar. The West Calgary Ring road will be opened to traffic in 2024. Credit: AlvinTo2000. The West Calgary Ring Road is a 9km-long section of Calgary Ring Road being built between Highway 8 and the Trans-Canada Highway within the existing Transportation Utility Corridor (TUC) in Alberta, Canada. The project is being undertaken by Alberta’s Ministry of Transportation. Once completed, the entire Calgary Ring Road will offer more than 100km of uninterrupted travel around Calgary, reducing traffic congestion in the city and improving access to important places such as hospitals, schools and workplaces. The West Calgary Ring road project was announced in July 2018 and is expected to open to traffic in 2024. The ring road will accommodate approximately 80,000 vehicles a day. The project is expected to generate up to 2,600 jobs during the construction phase. The project is being constructed in three sections, namely the North project, the South project and Bow River Bridge twinning project. It will include the construction of approximately a 9km-long six-lane and eight-lane divided freeway, the reconstruction of an approximately 5km section of Trans-Canada Highway, and the renovation of Stoney Trail stretching between Bow River and Scenic Acres. A total of six interchanges and 24 bridges will be constructed under the project. The North project segment will stretch between the Trans-Canada Highway and Old Banff Coach Road SW. The project includes the construction of an approximately 3km-long six-lane and eight-lane divided freeway between the Valley Ridge Boulevard NW and Stoney Trail in the northern side of Trans-Canada Highway. A southbound Stoney Trail mainline bridge with four centre piers, supporting 18 girders is one of the largest among all the bridges to be constructed under tthe North project. A connecting bridge between the northbound Stoney Trail and westbound Trans-Canada Highway will feature a super-elevation slope. The project also involves the reconstruction of a 5km-long section of Highway 1 (Trans-Canada Highway) and a 1km-long section of Valley Ridge Boulevard NW, development of two interchanges, namely Highway 1 and Valley Ridge Boulevard NW, and the construction of 1 Avenue SW flyover. The scope of work includes earthworks, upgrades of the watermain and storm sewer, and road construction. The South project segment will run between Old Banff Coach Road SW and Highway 8. A 5km-long six-lane and eight-lane divided freeway will be constructed under the South project, which will include four interchanges, namely Highway 8, Bow Trail SW, Old Banff Coach Road SW and 17 Avenue SW, as well as seven bridges and a pedestrian’s tunnel. An approximately 1km stretch of Bow Trail SW, 17 Avenue SW and Old Banff Coach Road, each within the TUC, will be reconstructed. The scope of work includes earthworks, a drainage upgrade, paving and the installation of public lighting systems. The twinning project includes the construction of a new four-lane bridge over Bow River and new southbound lanes on either side of the bridge, which comprises a new bridge over Scenic Acres Link NW joining southbound Stoney Trail to Scenic Acres Link NW as an exit ramp. An approximately 2km-long southbound Stoney Trail between Crowchild Trail and Scenic Areas Link will be widened. The surface for the North project was ready for landscaping in August 2020. The project includes the installation of 150 girders, with wood joists installed in between to support the plywood sheathing of the bridge deck. The third concrete bridge deck has been poured and a stormpond in the east of Valley Brook Circle NW has been completed. As part of the South project, gravel removal work has been completed in the south of Old Banff Coach Road SW. The installation of the watermain is underway in the north of Old Banff Coach Road SW. The geotechnical surveys across the South project area involve the installation of the standpipe piezometers to analyse ground conditions. Paving and guardrail installation along the new collector-distributor road is underway under the Bow River Bridge project. The conventional braced cofferdam is being drilled to construct bridge pier foundation. EllisDon received a design-build contract worth $463m for the construction of North project, while AECON and Flatiron received an $89m contract to develop West Bow River Bridge twinning project in March 2019. Calgary Safelink Partners, a consortium of Graham, VINCI and Carmacks, received a design-build contract worth $277m to develop the South project, in July 2020.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data