West Canal Concrete Lining
Closed · Washington · Last reported Nov 2024
Source: Dodge USA
construction of concrete lining within the West Canal. The principal work to be performed are earthwork, geomembrane installation and construction of about 3,100 linear feet of concrete lining in the existing West Canal with a bottom width of sixteen 16 feet.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Manufacturing (Industrial), Government, Cement
- Location
- Quincy, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Canal Concrete Lining
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construction of concrete lining within the West Canal. The principal work to be performed are earthwork, geomembrane installation and construction of about 3,100 linear feet of concrete lining in the existing West Canal with a bottom width of sixteen 16 feet. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Quincy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Manufacturing (Industrial), Government, Cement |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
