West Cliff Multi-Use Path Rehabilitation
Sector: Car parking • Location: Santa Cruz, California, United States of America
Source: Dodge USA
The project will refinish the West Cliff path s asphalt surface from Natural Bridges State Beach to David Way to enhance safety and accessibility for all users. This project aims to fix failing path sections to remove tripping hazards and replace the path's surface to extend the asphalt's life.
- Status
- Closed
- Sector
- Car parking, Bridge, Road, Automotive, Government, Commercial
- Location
- Santa Cruz, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about West Cliff Multi-Use Path Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will refinish the West Cliff path s asphalt surface from Natural Bridges State Beach to David Way to enhance safety and accessibility for all users. This project aims to fix failing path sections to remove tripping hazards and replace the path's surface to extend the asphalt's life. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Cruz |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Bridge, Road, Automotive, Government, Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
