logo
ProjectIn Progress

West Coast Express Locomotive Refurbishment

In progress · British Columbia

Source: Infrastructure Canada

West Coast Express (WCE) is a commuter rail service that runs from Mission to Vancouver, BC. It currently has 6 locomotives and a 7th is being acquired. Each locomotive leads trains of 4-10 cars, capable of holding up to 1,440 passengers. Train occupancy is high, particularly during peak hours, resulting in crowding that lowers satisfaction and limits ridership growth. At least 4 of 10 daily trips

Status
Under Construction
Sector
Automotive, Power Generation (CCGT), Rail, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about West Coast Express Locomotive Refurbishment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “West Coast Express Locomotive Refurbishment” is an infrastructure initiative in the Automotive sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

West Coast Express (WCE) is a commuter rail service that runs from Mission to Vancouver, BC. It currently has 6 locomotives and a 7th is being acquired. Each locomotive leads trains of 4-10 cars, capable of holding up to 1,440 passengers. Train occupancy is high, particularly during peak hours, resulting in crowding that lowers satisfaction and limits ridership growth. At least 4 of 10 daily trips have standees and service guidelines are not being met. Locomotives lack auxiliary Head End Power (HEP) to provide full heat and lighting in trains of 8 cars or more under full workloads. The current fleet has no spare locomotive; all 6 are in rotation for revenue service, inspection, and maintenance. The locomotives only meet Environmental Protection Agency (EPA) Tier 0 or Tier 1 emission standards (modern trains perform at Tier 4). Five locomotives will reach the end of their service life in 2-3 years. Given insufficient HEP and poor performance of an aging fleet, WCE cannot serve current ridership or increase capacity to meet growth. Without WCE, commuters will have to drive, increasing traffic congestion and reducing air quality. The West Coast Express Locomotive Refurbishment project is intended to refurbish 5 existing and 1 acquired locomotive, including by upgrading HEP to serve trains of up to 12 cars (1,728 passengers) at EPA Tier 3 emission standards, and to extend locomotive life by 15 years. It also will upgrade the HEP of an existing 7th locomotive to meet Tier 3 standards. (Note: while EPA Tier 4 is the standard for modern trains, Tier 3 is the best improvement that can be achieved for the existing fleet given available technology.) TransLink proposes to refurbish one locomotive at a time. Each refurbished locomotive will then be tested, commissioned, and enter service to release another locomotive for rehabilitation. This will also require temporary rental of one replacement locomotive to maintain the operational cycle of the fleet while the project is underway.

Original sector

Public Transit

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Automotive, Power Generation (CCGT), Rail, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project